Transmission Sector

  1. Build manufacturing plants (with lines) capacity (400 and 132) KV to support the electrical system and absorb the energies generated
  2. Rehabilitation transfer stations working and return to work within stings design
  3. Rehabilitation of the energy transfer lines that currently working.
  4. Set up transfer capacity of stations (3 * 90) MVA near load centers
  5. Use the quad conductors in transportation networks and the effort to connect the 400 kV stations of 400 KV to discharge loads investment terminals
  6. Use of thermal wires in the power transmission lines of 132 KV effort
  7. Replacing Ground wire Ground wire optical type OPGW with peripherals sites covered by the optical service