Iraq Energy Expo & Conference
7th Iraq Energy
Exhibition & Conference
10 - 12 June 2022 |
Home
Exhibit
Why Exhibit?
Product Sectors
Production Sector
Transport Sector
Distribution Sector
Renewable Energy
Investment
National Manufacturing
Exhibitor Essentials
Sponsorship
Help Us To Help You
Visit
Why Visit
About Republic of Iraq
About the Place
Media
Media Partners
Exhibition Interviews
Videos
News
Photo Gallery
Event Logos
IEE
Decors
Services
Shipping and logistics Services
Hotel offers
Passport and Visa Requirements
Contact
Transmission Sector
Build manufacturing plants (with lines) capacity (400 and 132) KV to support the electrical system and absorb the energies generated
Rehabilitation transfer stations working and return to work within stings design
Rehabilitation of the energy transfer lines that currently working.
Set up transfer capacity of stations (3 * 90) MVA near load centers
Use the quad conductors in transportation networks and the effort to connect the 400 kV stations of 400 KV to discharge loads investment terminals
Use of thermal wires in the power transmission lines of 132 KV effort
Replacing Ground wire Ground wire optical type OPGW with peripherals sites covered by the optical service